WORK AREA “A”- Science & Engineering Courtyard (North)/ Existing Building
- Monday: Steel Erection sequence 2A (New Addition); EXPECT MINOR VIBRATION & NOISE
- Monday: Basement MEP excavation and installation; Expect truck traffic and minor noise
- Monday: Installation of floor slab electric conduit
- Tuesday: Basement MEP excavation and installation
- Tuesday: Steel Erection sequence 2A (New Addition) EXPECT MINOR VIBRATION & NOISE
- Tuesday: Installation of floor slab electric conduit
- Tuesday: Install electrical manholes located between Butterfield & Steinmetz
- Wednesday: Steel Erection sequence 2A (New Addition); EXPECT MINOR VIBRATION & NOISE
- Wednesday: Basement MEP excavation and installation
- Wednesday: Install electrical manholes located between Butterfield & Steinmetz
- Wednesday: Basement Slab on Grade preparation
- Wednesday: Installation of floor slab electric conduit
- Thursday: Steel Erection New Addition; EXPECT MINOR VIBRATION & NOISE
- Thursday: Basement Slab on Grade preparation
- Thursday: Basement MEP excavation and installation
- Friday: Steel Erection New Addition; EXPECT MINOR VIBRATION & NOISE
- Friday: Basement MEP excavation and installation
- Friday: Installation of floor slab electric conduit
- Friday: Basement Slab on Grade preparation
WORK AREA “B”- South side of Science & Engineering
- Monday: Selective demolition & removals Level 1 through 3; EXPECT MINOR NOISE
- Tuesday: Selective demolition & removals Level 1 through 3; EXPECT MINOR NOISE
- Tuesday: Exterior Brick & Concrete removal SW corner (Start 1pm)
- Wednesday: Selective demolition & removals Level 1 through 3; EXPECT MINOR NOISE
- Wednesday: Exterior Brick & Concrete removal SW corner (Start 2pm)
- Thursday: Exterior Brick & Concrete removal SW corner (Start 1pm)
- Thursday: Relocation condenser units
- Thursday: Selective demolition & removals Level 1 through 3; EXPECT MINOR NOISE
- Friday: Selective demolition & removals Level 1 through 3; EXPECT MINOR NOISE
- Friday: Relocation of condenser units
- Friday: Exterior Brick & Concrete removal SW corner (Start 1pm); EXPECT NOISE & VIBRATION