WORK AREA “A”- Science & Engineering Courtyard (North)/ Existing Building
- Monday: Steel Erection & Detail work (New Addition); EXPECT MINOR VIBRATION & NOISE
- Monday: Basement MEP excavation and installation; Expect truck traffic and minor noise
- Monday: Installation of floor slab electric conduit
- Tuesday: Basement MEP excavation and installation
- Tuesday: Steel Erection & Detail work (New Addition) EXPECT MINOR VIBRATION & NOISE
- Tuesday: Installation of floor slab electric conduit
- Wednesday: Steel Erection & Detail (New Addition); EXPECT MINOR VIBRATION & NOISE
- Wednesday: Basement MEP excavation and installation
- Wednesday: Installation of floor slab electric conduit
- Thursday: NO WORK HAPPY THANKSGIVING!
- Friday: Steel Erection & Detail New Addition; EXPECT MINOR VIBRATION & NOISE
- Friday: Basement MEP excavation and installation
- Friday: Installation of floor slab electric conduit
WORK AREA “B”- South side of Science & Engineering
- Monday: Selective demolition & removals Level 1 through 3; EXPECT MINOR NOISE
- Monday: Install temporary stair enclosures
- Tuesday: Selective demolition & removals Level 1 through 3; EXPECT MINOR NOISE
- Tuesday: Install temporary stair enclosures
- Wednesday: Selective demolition & removals Level 1 through 3; EXPECT MINOR NOISE
- Wednesday: Install temporary stair enclosures