During Week 3, I narrowed down the parts that needed to be ordered for work this term. I did not go through the SRG process. I ordered these parts through the department. Professor Dosiek and I continued discussions about what could possibly be added to the skates and what kinds of tests would need to be run. The first part that needed to be tested was the linear generator. The parts to construct the first linear generator were ordered. We also decided it would be a good idea to order a shake light flashlight. The flashlight was ordered to look at the circuitry it contained. The order forms for the parts can be seen below.