Posted on Mar 12, 2002

The renovation of the bleachers and press box on Frank Bailey Field began on March 12, 2002, with the demolition of the existing structure, which had been on the field since 1984. In fact, the bleacher portion of the structure had been on the field since before the fall of 1980.