During week 10 of fall term, I wrapped up my work and wrote a preliminary design report, one that would eventually become the basis of the report to be written in the winter.
The report is linked below:
During week 10 of fall term, I wrapped up my work and wrote a preliminary design report, one that would eventually become the basis of the report to be written in the winter.
The report is linked below:
Recent Comments